Cutting And Grinding Discs: Matching The Abrasive To The Job
Keeping a stock of the right tungsten types, collets and gas lens sizes for the work you do avoids a lot of avoidable downtime, and it's the sort of consumables range worth sourcing from a specialist supplier like Tec Products.
The practical difference comes down to what a machine can draw and sustain. A single-phase supply has a ceiling on how much continuous power it can deliver before tripping breakers or overloading domestic wiring, which is why the highest-output welding and cutting equipment is frequently three-phase only, or offers noticeably better duty cycle performance when run on three-phase. For workshops without an existing three-phase supply, bringing one in usually means an electrician and, in some cases, an application to the local distribution network operator.
Getting the air supply, cutting capacity and portability right for your workshop is easier with some guidance up front, and that's the kind of buying question the team at Tec Products are set up to help with.
Abrasive discs look interchangeable on a shelf but perform very differently depending on what they're made from and what they're used on. Cutting discs are generally thin, designed to slice through material quickly with minimal heat build-up, while grinding discs are thicker and shaped to remove material from a surface or clean up a weld, rather than cut all the way through it.
A gas lens sits in place of the standard collet body and uses a fine mesh to straighten the shielding gas flow into a smoother, more laminar stream around the arc. This generally allows a longer stick-out from the cup without turbulence pulling in surrounding air, which is particularly useful when working in tighter joints or awkward positions where the torch needs to sit further back from the work.
Before choosing a machine, it's worth checking what your workshop's consumer unit and incoming supply can actually handle, not just what socket is nearest the bench. Buying a three-phase-only machine for a single-phase workshop, or underestimating the load a higher-output single-phase welder places on existing wiring, are both avoidable problems with a bit of checking upfront.